Interim infill drilling results confirm near surface copper oxides at Azurite
As part of the Redbank Oxide Copper Project expansion definitive feasibility study (DFS) announced on 25 March 2008, infill and definition drilling is being carried out on the Bluff, Azurite and Redbank deposits. This will enable detailed pit planning and mine scheduling to be completed. Preliminary results for the Azurite Deposit are reported here. Further preliminary results from Redbank and Bluff will be reported as program progresses.
Attached Files
Interim infill drilling results confirm near surface copper oxides at Azurite
170.08 kB, modified 1:02pm 03/04/2008
Offline Files