Interim Drilling Results from Redbank Copper Project
Attached Files
Interim Drilling Results from Redbank Copper Project
100.27 kB, modified 10:30am 22/01/2007
Offline Files
Similar Articles
- Spectacular near surface copper grades at Redbank
- Drilling Commences at the Redbank Copper Project
- Interim infill drilling results confirm near surface copper oxides at Azurite
- Stage 2 Oxide Expansion Drilling Commences
- New Breccia Pipe: 64m at 2.5% Copper from Surface; Sulphides at Depth